Thursday, November 27, 2025
C3GLOBE
No Result
View All Result
No Result
View All Result
C3GLOBE
No Result
View All Result
Home Architecture World

A new memorial space in Sants district of Barcelona

An intervention in respect for the industrial heritage

MIRAG – MILLET RAMONEDA

In the Sants district of Barcelona, there are treasures of industrial heritage with significant preservation value. As industrial structures evolved, they faded from their former glory, but it is impossible to ignore the history that shaped the current urban space. Some structures have been lost, some overshadowed by new entities, and many are living structures that have been adapted to meet needs and are still being utilized today. This is a characteristic of modern architectural heritage. Paradoxically, this makes their value easy to overlook.

The German Climent factory, where the new memorial space is located, is a registered heritage site that preserves the history of the region. It is known that in 1925, the Climent brothers, who ran a metal furniture company, commissioned architect Modest Feau Estrada to construct the building. This typical industrial structure features a roof made of metal trusses and wooden beams, and red brick walls. Before becoming a memorial space, it was used as a children’s play area called Happy Park. When Happy Park opened in 1994, it was advertised as the largest children’s play facility in Spain and the first in Barcelona, boasting an area of 1,200m² with slides, trampolines, and ball pits.
In 1999, when the German Clemente factory was designated as a municipally Mlmanaged heritage building, the urban plan for the Sants area was revised in the early 2000s to preserve such architectural heritage. As a result, the German Climente factory, along with industrial buildings and modern-style residential buildings in Comtes de Bell-lloc, were protected under the building use classification.

The new memorial space maintains the existing architectural structure and style as much as possible, existing in the form of a building within a building and Is divided into plane elements. The south façade has a corridor as a public realm, which leads to each of the four family spaces located in the center of the building. Along the opposite north façade, an service corridor runs between the technical rooms. At the end of the building is the ceremonial hall. It utilizes the space between the roof trusses to receive light from the high ceilings. All wooden elements of the walls, floors, and ceilings are finished in a uniform light color, giving a unification and revealing the calm character of the place where the last moments of life are spent. This contrasts with the warm wooden roof. In addition, wood has the advantage of being sustainable and easy to dismantle in the future.
The walls of the family room are designed with a meandering organic form to soften the atmosphere. The roof of the office space and ceremony room, on the other hand, forms a regular volume that represents a pure form connected to spirituality. The intervention, which respects elements of the past, clearly shows the contrast between the old and new spaces, but also allows them to discover the value of each other’s existence. Such an approach to architectural preservation will make the city sustainable and transform it into a space prepared for the future.

Project: REFURBISHMENT OF THE FORMER GERMANS CLIMENT FACTORY AND ADAPTATION AS A FUNERAL HOME, BARCELONA / Location: Barcelona, Spain / Architects: MIRAG – MILLET RAMONEDA (Xavier Ramoneda, Pau Millet) / Use: Funeral home / Surface: 1,200m² / Year: 2020~2023 / Photograph: ⓒDel Rio Bani (courtesy of the architect)

Tags: memorial spaceSpaintruss


Related Posts

Latest

Boathouse Zaka

Ecologically revitalized from a lakeside cabin OFIS architects Lake Bled lies in the foothills of...

byc3editor
2025-11-25
Latest

Tao House

Where quietness flows in the shade of memory HW Studio Some houses are not “designed”...

byc3editor
2025-11-24
World

Orientkaj and Nordhavn Metro Stations

Linking Copenhagen’s northern dockland redevelopment area with the city center Arup + Cobe As part...

byc3editor
2025-11-15
World

1000m² Prefabricated Housing

Fulfilling immediacy, flexibility and resource optimization SUMMARY The requirements for this project were boldly defined...

byc3editor
2025-11-13
Latest

Forest Pool

Topped with corrugated roof on a ruin of mud and debris Mjölk architekti In the...

byc3editor
2025-11-11
Latest

The Grand Egyptian Museum

A wedge rising by ancient pyramids completed after 2003 competition Heneghan Peng Architects Located about...

byc3editor
2025-11-10
Next Post

Beijing MM Farm Hotel

C3GLOBE

© All rights reserved. K-ARCHITECTURE | 18 GongHangDaeRo 2Gil GangSeo-gu Seoul 07622 Korea | Tel_+82 2 2661 1513 | Email_editorial@c3globe.com

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result

© All rights reserved. K-ARCHITECTURE | 18 GongHangDaeRo 2Gil GangSeo-gu Seoul 07622 Korea | Tel_+82 2 2661 1513 | Email_editorial@c3globe.com